Home Hot Mopping Tub Walls

Hot Mopped Shower Pan Liners

DK Shower Pans

Hot Mopping Tub Walls

E-mail Print PDF

When you have a your tub and shower laid out next to each other the dividing wall and/or ledge should be hot mopped. That wall needs to be faced with sheathing or filled between the studs from bottom plate to top with solid material. If the tub is lower than the top of the dividing wall then the portion facing the tub should be blocked and can be mopped down to the tub deck.

 

 

 

DISCLAIMER
Reasonable care has been taken in preparation of this information, but DK Shower Pans, Inc. makes no warranty, expressed or implied, with respect to this information and makes no representations and assumes no liability for any direct, incidental or consequential damages resulting in the use of the information contained on this website

 

 

Last Updated ( Thursday, 08 July 2010 02:25 )  

Got You Covered

  • Insurance and workman’s comp certifications

  • Same day availability

  • We are able to meet your job Pre-Qualification

  • We use Low-smell asphalt!

  • One to multi-pan projects we have the manpower to keep your projects on schedule